Question: A new structure is planned to be constructed in an offshore location and will apply an estimated surface load of 2 5 0 kPa directly
A new structure is planned to be constructed in an offshore location and will apply an estimated surface load of kPa directly to the seafloor. The seafloor consists of a thick layer of normally consolidated marine clay which overlies an impermeable rock formation see figure below The clay has a saturated density of
A sample of the clay layer is tested in the lab and was found to have an initial void ratio of a compression index of and a coefficient of consolidation of
Assume that the water level remains constant during and after loading above seafloor Consolidation charts can be found on the last page of the exam.
a Calculate the total amount of settling that will occur due to consolidation of the clay layer
b How long will it take the clay layer to reach of the total consolidation?
c Calculate the effective stress at a point in the middle of the clay layer red circle in the plot when the soil reaches consolidation
d If the clay was actually overconsolidated rather than normally consolidated would the total amount of settling increase or decrease compared to your answer in a How do you know?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
