Question: A plant is capable of processing 2 , 4 0 0 tons of material per year ( 1 0 0 % capacity ) . If

A plant is capable of processing 2,400 tons of material per year (100% capacity). If the material cost is $0.35 per pound, what is the expected total annual material cost if the plant is operated at 85% capacity? Recall that 1 ton =2,000 pounds.