Question: A power generating station has a maximum demand of ( 10,000 mathrm{~kW} ) and the daily load on the station is as follows: (a) Draw

A power generating station has a maximum demand of \( 10,000 \mathrm{~kW} \) and the daily load on the station is as follows: (a) Draw the load curve and the load duration curve. (b) Choose the size and number of generating units. (c) Draw up the operating schedule of the units. (d) What reserve plant would be necessary? (e) Calculate the load factor, plant capacity factor and plant use factor of the station. [Ans. (b) Three units of 5000, 2500 and \( 2500 \mathrm{~kW} \) capacity, (d) \( 5000 \mathrm{~kW} \), (e) \( 55 \%, 36.66 \%, 86.5 \% \) ]
A power generating station has a maximum demand of \( 10,000 \mathrm{~kW}

13 A power generating station has a maximum demand of 10,000kW and the daily load on the station is as follows: (a) Draw the load curve and the load duration curve. (b) Choose the size and number of generating units. (c) Draw up the operating schedule of the units. (d) What reserve plant would be necessary? (e) Calculate the load factor, plant capacity factor and plant use factor of the station. [Ans. (b) Three units of 5000,2500 and 2500kW capacity, (d) 5000kW, (e) 55%,36.66%,86.5%]

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!