Question: A power system is operating close to its maximum roadability limit , with a critical voltage of Vc = 0 . 8 p . u

A power system is operating close to its maximum roadability limit, with a critical voltage of Vc =0.8 p.u. at one of its load buses. A disturbance increases the reactive power demand by 0.3 p.u., bringing the system closer to instability.
1. Calculate the new load bus voltage assuming a simple linear relationship: where k =0.5 p.u.
2. Propose a load shedding strategy that reduces the reactive power demand by 0.15
p.u. and calculate the new voltage.
3. Discuss why load shedding is an effective emergency measure to prevent voltage collapse.