Question: A power system is operating close to its maximum roadability limit , with a critical voltage of Vc = 0 . 8 p . u
A power system is operating close to its maximum roadability limit with a critical voltage of Vc pu at one of its load buses. A disturbance increases the reactive power demand by pu bringing the system closer to instability.
Calculate the new load bus voltage assuming a simple linear relationship: where k pu
Propose a load shedding strategy that reduces the reactive power demand by
pu and calculate the new voltage.
Discuss why load shedding is an effective emergency measure to prevent voltage collapse.