Question: A power system is supplied by three generating units that are rated at 1 5 0 , 2 0 0 and 2 5 0 MW

A power system is supplied by three generating units that are rated at 150,
200 and 250 MW, respectively. What is the maximum load that can be securely
connected to this system if the simultaneous outage of two generating units is
not considered to be a credible event?