Question: A precision drill machine is available 24 hours a day. On a typical day, the machine handles 300 drill jobs. Each job takes 2.5 minutes

A precision drill machine is available 24 hours a
A precision drill machine is available 24 hours a day. On a typical day, the machine handles 300 drill jobs. Each job takes 2.5 minutes for setup and 1.5 minutes for actual drilling. About 10% of the jobs need to be reworked. Assume that for each rework job the set-up time and the processing time have to be repeated one time. That means a job with rework requires two rounds of setup & drilling, in total, to be finished. The machine is idle between jobs. In your answers, percentages should have 2 decimal places, eg. 23.67%. ()[6] What is the total non-value-added time in minutes? (For example: enter 200 for 200 minutes) (b)[6] What is the overall equipment effectiveness (OEE)? (For example: enter 23.67 for 23.67%) (C)(3) What is the percentage of wasted setup time in the total available time? (For example enter 23.67 for 23.67%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!