Question: A primary consideration in assigning a cost to a responsibility center is ________. A) whether the cost is fixed or variable. B) whether the cost
A primary consideration in assigning a cost to a responsibility center is ________.
A) whether the cost is fixed or variable.
B) whether the cost is direct or indirect.
C) who can best control the change in that cost.
D) where in the organizational structure the cost was incurred.
Step by Step Solution
3.40 Rating (156 Votes )
There are 3 Steps involved in it
The primary consideration in as... View full answer
Get step-by-step solutions from verified subject matter experts
