Question: A process designer has a choice of two methods for making an item. Method J has a fixed cost of RM3000 for tooling and jigs
A process designer has a choice of two methods for making an item. Method J has a fixed cost of RM3000 for tooling and jigs and a variable costs of RM2 per unit. Method K requires a special machine costing RM14 500 and the variable costs are RM5 per unit. Based on the data given, which of the following statements is TRUE? *
total cost for J = 3000 + (2* unit)
total cost for J = 3000 + (2* cost RM)
total cost for K = 14500 + (2* unit)
total cost for J = 14500 + (5* cost RM)
refer to cost-volume analysis given in the previous question, calculate the equalization point, p *
Your answer
refer to cost-volume analysis given in the previous question, if the intended volume is 10000 units, which process is likely to be selected? Give your reasons *
Your answer
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts