Question: A process requires six sequential steps with the following times. Assume only one machine at each step: Step 1: 2 minutes Step 2: 3 minutes

A process requires six sequential steps with the following times. Assume only one machine at each step:

  1. Step 1: 2 minutes
  2. Step 2: 3 minutes
  3. Step 3: 2 minutes
  4. Step 4: 4 minutes
  5. Step 5: 1 minute
  6. Step 6: 5 minutes

a Which step is the process bottleneck?

b What is the capacity of the process in units per hour?

c What is the capacity of the process (in units per hour) if a second identical machine is added to Step 2?