Question: A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and

A production process at Kenneth Day Manufacturing

A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel) 2.1 units/hr 7 units/hr Sanding Assembly 0.8 units/hr @ 8 (0) Sawing Welding 2.5 units/hr Assembly 0.8 units/hr Drilling 5 units/hr Assembly 0.8 units/hr e) Sawing is the bottleneck 5) The bottleneck time is 28.57 minutes per unit (round your response to two decimal places) -) The throughput time of the overall system is minutes (round your response to two decimal places)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!