Question: A project has a C P I > 1 . 0 and an S P I 1 . 0 . This would indicate the project

A project has a CPI >1.0 and an SPI 1.0. This would indicate the project is:
A. behind schedule with a cost savings
B. ahead of schedule with a cost savings
C. behind schedule with a cost overrun
D. ahead of schedule with a cost savings
 A project has a CPI >1.0 and an SPI 1.0. This