Question: - A project with IRR = -100% is operating at __________. A) the cash break-even point B) the accounting break-even point C) the financial break-even

- A project with IRR = -100% is operating at __________.

A) the cash break-even point

B) the accounting break-even point

C) the financial break-even point

D) an amount less than all break-even points

E) an amount greater than all break-even points