Question: A pull production system has these parameters: consumption rate or demand of 334 units per week, supplier lead time is 2 weeks, items come in
A pull production system has these parameters: consumption rate or demand of 334 units per week, supplier lead time is 2 weeks, items come in boxes of capacity 24 units and a safety stock of 29 % of the lead time demand is required. Calculate the required number of Kanbans.