Question: a Quality engineer wanted to construct and s - chart control process variability. The average standard deviation of the collected sample was 0 . 2

a Quality engineer wanted to construct and s-chart control process variability. The average standard deviation of the collected sample was 0.2. Samples with 15 components for each determine the upper and lower control limits?