Question: A rail - guided vehicle system is being planned as part of an assembly cell consisting of two parallel lines, as in Figure P 1
A railguided vehicle system is being planned as part of an assembly cell consisting of two
parallel lines, as in Figure P In operation, a base part is loaded at station and delivered
to either station or where components are added to the base part. The RGV then goes to
either station or respectively, where further assembly of components is accomplished.
From stations or the completed product moves to station for removal from the system.
Vehicles remain with the products as they move through the station sequence; thus, there is
no loading and unloading of parts at stations and After unloading parts at station
the vehicles then travel empty back to station for reloading. The hourly moves partshr
above the slash and distances ft below the slash are listed in the table below. Moves
indicated by L are trips in which the vehicle is loaded, while E indicates moves in which
the vehicle is empty. RGV speed ftmin Assembly cycle times at stations and
min each, and at stations and min each. Load and unload times at stations and
respectively are each min Traffic factor and availability How many
vehicles are required to operate the system? Give Answer with Flexible manufacturing formula
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock