Question: a ) Re - do Example 2 ( Section 6 . 2 ) of the CCG for a 1 5 % increase in all traffic

a) Re-do Example 2(Section 6.2) of the CCG for a 15% increase in all traffic on the minor road (in both directions).
b) For both the original and the increased traffic volumes, allocate the green time such that the minor road gets a q/C of 1.0(i.e., operates at capacity) for all critical movements.
c) For both the original and the increased traffic volumes, investigate the adequacy of the cycle time.a) Re-do Example 2(Section 6.2) of the CCG for a 15% increase in all traffic on the minor road (in both directions).
b) For both the original and the increased traffic volumes, allocate the green time such that the minor road gets a q/C of 1.0(i.e., operates at capacity) for all critical movements.
c) For both the original and the increased traffic volumes, investigate the adequacy of the cycle time.a) Re-do Example 2(Section 6.2) of the CCG for a 15% increase in all traffic on the minor road (in both directions).
b) For both the original and the increased traffic volumes, allocate the green time such that the minor road gets a q/C of 1.0(i.e., operates at capacity) for all critical movements.
c) For both the original and the increased traffic volumes, investigate the adequacy of the cycle time.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!