Question: A restaurant conducted a time study for a job assembling ham and cheese sandwiches. There were 10 cycles on the job and the average time
A restaurant conducted a time study for a job assembling ham and cheese sandwiches. There were 10 cycles on the job and the average time was recorded to be 0.385 minutes. Determine the standard time of the assembly if the operator is rated 80% and the allowance factor is 12%.
Step by Step Solution
3.51 Rating (161 Votes )
There are 3 Steps involved in it
First we need to calculate the Normal Time NT which is basically the ave... View full answer