Question: A rig with 1 0 0 0 HP input power uses a drill line with a maximum tension load - bearing capacity of 6 0
A rig with HP input power uses a drill line with a maximum tension loadbearing
capacity of lbf
a What is hoisting? Also, name two well construction activities where hoisting is required?
b Calculate the expected velocity in of the fast line if the rig is pulling of the
maximum allowable load with lines.
One tripping scenario has the rig of problem pulling a simple drillstring made up of
of drillpipe from bottom in ppg mud.
a Briefly explain why the weight indicator will show a lower value when the drillstring is
suspended in ppg mud than when it would be suspended in air.
b When the rig is pulling on lines, calculate the load that is shared by derrick legs C & D in
lbf and the expected velocity in of the block while assuming only of the drawworks
input power given in problem is used.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock