Question: A road maintenance work ( soft soil ) excavation work is being carried out on a wide work site and a normal work area. The

A road maintenance work (soft soil) excavation work is being carried out on a wide work site and a normal work area. The width is 8 m, the one-way working distance is 80 m, and the excavation depth is 0.1 m. What is the hourly work volume of a motor grader with a blade length of 3.6 m