Question: A singlestation assembly machine is to be considered, with the data given in the table below. Determine (a) production rate (asbys/hr), (b) yield of good
A singlestation assembly machine is to be considered, with the data given in the table below. Determine (a) production rate (asbys/hr), (b) yield of good product (final assemblies containing no defective components), and (c) uptime efficiency (%) of the system. Handling time to load the base part and unload the finished assembly is 7 sec and the downtime averages 1.5 min every time a component jams.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts