Question: A site 1 5 0 m 2 5 0 m is to be stripped and reduced to design level and the material removed. The estimated
A site is to be stripped and reduced to design level and the material
removed. The estimated volume is of clay and of topsoil assume
this is the "solid volume" from design
There is good flat access to the site and tipping space is available km away. The job
needs to be completed in weeks working a hour week.
Determine the numbers of loaders and trucks required to perform the earthwork.
State any assumptions you make.
Assumption: for clay consider expansion & for top soil consider expansion
Tip: Assume reasonable capacities for the loader bucket & trucks in eg
for loader bucket and for truck