Question: A site 1 5 0 m 2 5 0 m is to be stripped and reduced to design level and the material removed. The estimated

A site 150m250m is to be stripped and reduced to design level and the material
removed. The estimated volume is 18,000m3 of clay and 10,000m3 of topsoil (assume
this is the "solid volume" from design).
There is good flat access to the site and tipping space is available 2.5 km away. The job
needs to be completed in 10 weeks working a 40 hour week.
Determine the numbers of loaders and trucks required to perform the earthwork.
State any assumptions you make.
Assumption: for clay consider 30% expansion & for top soil consider 20% expansion
Tip: Assume reasonable capacities for the loader bucket & trucks in m3(e.g.1.5m3
for loader bucket and 14m3 for truck)
A site 1 5 0 m 2 5 0 m is to be stripped and

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!