A small assembly line for the assembly of power steering pumps needs to be balanced. The precedence
Fantastic news! We've Found the answer you've been seeking!
Question:
A small assembly line for the assembly of power steering pumps needs to be balanced. The precedence diagram is shown below.
- The cycle time is determined to be 1.9 minutes. How would the line be balanced by choosing the assignable task having the longest task time first? Fill in the table below. If your answer is zero, enter "0". Round your answers to one decimal place.
Station
Tasks
Total Time
Idle Time
1
B,A,C,D
?
?
2
E,F
?
?
3
G,H,I
?
?
Total
?
?
- What is the assembly-line efficiency? Round your answer to one decimal place.