Question: A small engineering company makes two products for export, A and B. Both products go through a four stage process: turning, grinding, polishing, finishing. The
A small engineering company makes two products for export, A and B. Both products go through a four stage process: turning, grinding, polishing, finishing. The two products are produced in batches of 100 items and the time taken in hours, for each batch to go through each stage is shown in the table. Determine the optimal solution for this problem?

Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts