Question: A system has 6x25 MW generators. The first three have the failure rate of 0.01 and the last two have the failure rate of 0.02

A system has 6x25 MW generators. The first three have the failure rate of 0.01 and the last two have the failure rate of 0.02 and one of them has FOR of 0.015