Question: A table is assembled using three components, as shown in the accompanying product structure tree. The compary that makes the table wants to ship 100


A table is assembled using three components, as shown in the accompanying product structure tree. The compary that makes the table wants to ship 100 units at the beginning of day 4,150 units at the beginning of day 5 , and 200 units at the beginning of day 7 Receipts of 100 wood sections are scheduled ot the beginning of day 2 . There are 120 legs on hand, and 60 braces on hand. Lead times (in days) for all items are shown in the following table. Prepare a material requirements plan using lot-for-lot ordering. (Note: Since the lead tlme varles based onorder quantity it is possible to ploce two separate orders on the same day. Leave no cells blank - be certaln to enter no* wherever requlred.) Click here for the Excel Data File Master Schedule A table is assembled using three components, as shown in the accompanying product structure tree. The compary that makes the table wants to ship 100 units at the beginning of day 4,150 units at the beginning of day 5 , and 200 units at the beginning of day 7 Receipts of 100 wood sections are scheduled ot the beginning of day 2 . There are 120 legs on hand, and 60 braces on hand. Lead times (in days) for all items are shown in the following table. Prepare a material requirements plan using lot-for-lot ordering. (Note: Since the lead tlme varles based onorder quantity it is possible to ploce two separate orders on the same day. Leave no cells blank - be certaln to enter no* wherever requlred.) Click here for the Excel Data File Master Schedule
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
