Question: A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 230
A table is assembled using three components, as shown in the following product structure tree. The company that makes the table wants to ship 230 units at the beginning of day 4, 300 units at the beginning of day 5, and 370 units at the beginning of day 7. Receipts of 230 wood sections are scheduled at the beginning of day 2. There are 270 legs on hand. An additional 10 percent of the order size on legs is added for scrap allowance. There are 55 braces on hand. Lead time (in days) for all items is a function of each order quantity and is shown below. Order Quantity Lead Time (days) 1370 1 371950 2 9511,700 3
Prepare the material requirements plan using lot-for-lot ordering. (Do not leave any empty spaces; input a 0 wherever it is required.)
| Production Schedule | ||||||||
| Day | Beg. Inv. | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Quantity | 230 | 300 | 370 | |||||
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts