Question: A utility disruption plan is required by NFPA 99 The joint commission patient safety standards. The joint commission environment of care standards NFPA 101

A utility disruption plan is required by

  1. NFPA 99
  2. The joint commission patient safety standards.
  3. The joint commission environment of care standards
  4. NFPA 101