Question: A water resources engineer is considering a new runoff diversion plan as shown schematically in the figure below. The plan requires runoff to flow through

A water resources engineer is considering a new runoff diversion plan as shown schematically in the figure below. The plan requires runoff to flow through five different materials which are capable of absorbing different amounts of the incoming flow (Q). The key design consideration is to determine what the remaining runoff (Q2) will be for different input flow (Q1) amounts. Solve the problem by first defining a set of linear equations using conservation of mass at each of the different runoff materials. Use these sets of linear equations to define a matrix that describes the system and use NumPy to solve the set of linear equations to determine the intermediate flow values (QA to QG) and the output flow Q2 given Q1 is 10m3s. Report your answers in a table [Course Objective #3 and #5]:
*in jupyter lab please!!*
A water resources engineer is considering a new

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!