Question: A well was produced for 4 0 hours at a rate of 9 0 s t b d and then shut for another 4 0
A well was produced for hours at a rate of and then shut for another hours. Sketch a typical rate profile at surface vs time for the following cases:
The whole production is from the sandface
II of the production is from the sandface
III. The whole production is from the wellbore
Step by Step Solution