Question: a ) What are the differences between capacity, design capacity, effective capacity, and utilization. b ) A manufacturing company operates a production line to assemble

a) What are the differences between capacity, design capacity, effective capacity, and utilization.
b) A manufacturing company operates a production line to assemble electronic devices. The production line runs for 8 hours a day, 5 days a week. The setup time for each product variant is 30 minutes, and the average run time to produce one unit is 5 minutes. The company aims to produce 400 units per day to meet demand. Calculate the cycle time, throughput rate, efficiency, and utilization of the production line.