Question: a) What is the average time for element 1 (check minibar) = ? b) Based on the given performance factor for element 1, what is

a) What is the average time for element 1 (check minibar) = ?
b) Based on the given performance factor for element 1, what is the normal time for it = ?
c) What is the average time for element 2 (make one bed) =?
d)Based on the given performance factor for element 2, the normal time for it = ?
e) what is the average time for element 3 (vacuum floor) =?
Homework: Portfolio 3 Part 3 (chapter 10) Question 4, Problem 10.22 HW Score: 55%, 11 of 20 points O Points: 0 of 3 Save A hotel housekeeper, Alison Harvey, was observed five times on each of four task elements, as shown in the following table. 1 Element Check minibar Make one bed Vacuum floor Clean bath Performance Rating 98% 92% 115% 100% 1.6 2.2 1.7 3.4 Observation (minutes per cycle) 2 3 4 1.5 1.3 1.6 2.6 2.1 2.3 1.8 1.9 1.3 3.7 3.5 3.5 5 1.5 2.4 1.5 3.2 Assume a 15% allowance factor. The standard time for this process = minutes (round your response to two decimal places)Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts