Question: . A wind farm operator wants to transmit 2 5 0 0 MW from a rural local to a load center located 3 0 0

. A wind farm operator wants to transmit 2500 MW from a rural local to a load center located 300 km away. Determine the number of three-phase, uncompensated transmission lines required to transmit this power with one line out of service (this is to be stable under a n-1 contingency condition) for the following options for line voltages: (a)345-kV lines, Zc =320,(b)500-kV lines, Zc =275,(c)765-kV lines, Zc =260. Assume that VS =1.0 per unit, VR =0.95 per unit, and max =40 deg, and a of 5000 km

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!