ABC Berhad was awarded an MRT project for RM 500 million. The construction of a 300- meter tunnel to avoid the 30-story high-rise skyscraper is one of the project's packages.
a. Evaluate how the procurement manager come up with the tendering procedure of constructing the building of the 300-meter tunnel.
b. Create the structure of the document required for ABC Berhad to tender out the tunnel project?
c. Analyze the possible procedure required to evaluate the tender submitted by the specialist contractor for the tunnel sub-package work.