Question: Activity 1 : For the given scenario perform a simulation in GPSS Let us consider a scenario representing a machine tool in a manufacturing shop

Activity 1: For the given scenario perform a simulation in GPSS
Let us consider a scenario representing a machine tool in a manufacturing shop which is turning out parts at the rate of every 5 minutes. The parts are then examined by the inspector who takes 4+-3 minutes for each part and rejects about 10% of the parts. We can represent each parts by one transaction, and the time unit selected for the problem will be 1 minute.
perform the following for above scenario :
A) Write a GPSS code for Single inspector (single server) and analyse the output for 1080 parts and find Total simulation time duration, waiting time, utilization of the server.
B) Write a GPSS code for three inspectors (multi server) and analyse the utilization of inspectors, waiting time
C) What changes you will get if the time required to inspect the parts is 6+-2?
What changes you will get if we increase one more inspector?
D) Write a GPSS program that will tabulate the distribution of the parts inspection process according to time,
 Activity 1: For the given scenario perform a simulation in GPSS

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!