Question: Activity A Consult with engineering B Determine equipment layout C Install equipment D Order materials E Test equipment F Train employees G Perform pilot runs


Activity A Consult with engineering B Determine equipment layout C Install equipment D Order materials E Test equipment F Train employees G Perform pilot runs H Get OSHA approval Duration (weeks) 7 6 4 4.5 3 7 1 5 on WAO Predecessors None None A,B A D, E F E A 7 None 0 7 B 6 None 0 16 4 A, B 7 11 4) 0 D 4.5 A 7 11.5 E C 11 14 F 7 DE 14 21 G 1 F 21 22 F E H 5 14 19 ming the backward pass. Fill in the table below (enter your responses rounded to one decimal place). LS LF Activity Duration (weeks) Predecessors H 5 E G 1 F F 7 DE E 3 o o o 4 D 4.5 A 4 , B 6 None 7 None way the project couts your company $1.500 Support you know the detyrbered by www.conto 2.000, Acante wed by county 3300 and Theme) Activity A Consult with engineering B Determine equipment layout C Install equipment D Order materials E Test equipment F Train employees G Perform pilot runs H Get OSHA approval Duration (weeks) 7 6 4 4.5 3 7 1 5 on WAO Predecessors None None A,B A D, E F E A 7 None 0 7 B 6 None 0 16 4 A, B 7 11 4) 0 D 4.5 A 7 11.5 E C 11 14 F 7 DE 14 21 G 1 F 21 22 F E H 5 14 19 ming the backward pass. Fill in the table below (enter your responses rounded to one decimal place). LS LF Activity Duration (weeks) Predecessors H 5 E G 1 F F 7 DE E 3 o o o 4 D 4.5 A 4 , B 6 None 7 None way the project couts your company $1.500 Support you know the detyrbered by www.conto 2.000, Acante wed by county 3300 and Theme)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
