Question: Activity A. Place left side inside up on the work area B. Tap back in C. Tap seat in D. Tap bottom rung in E.

Activity A. Place left side inside up on the work
Activity A. Place left side inside up on the work
Activity A. Place left side inside up on the work
Activity A. Place left side inside up on the work
Activity A. Place left side inside up on the work area B. Tap back in C. Tap seat in D. Tap bottom rung in E. Tap bottom rack in F. Align all slots and tap right side in Standard Time (Seconds) 5 8 13 7 9 15 Left side Back Please Seat 000 Bottom rung Bottom rack Right side Precedence network for this assembly: sec Sex B 13 sec 15. F 26 D E Using "Assign the task with the longest time" rule to design the assembly line (i.e. assign the tasks to the workstations). Work Station 1 Idle Time Left 30 Sec (30-5) = 25 Sec Eligible Will Fit Assign (Time) A (5) 6 i point Question 6. What will be the idle time at Workstation 1 (in seconds)? Type your answer... 7 1 point Question 7: What will be the idle time at Workstation 2 (in seconds)? Type your answer... 8 1 point A manager has received an analysis of three cities (A, B and C) being considered for a new office complex: (10 points is the maximum) Location Scores Factor A Business services..... 9 5 5 Construction cost...... 5 6 5 Personal taxes........ 5 5 4 Consider that the weight of Business services' factor is 1. Business services' and 'Personal taxes' are equally important The importance of 'Construction cost' factor is twice more than each of the other two factors. Question 8: What is the composite score for location A? Type your

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!