Question: Activity Actual Cost Earned Value Percent Complete Planned Value planned Completion Budget WES Activity fAssignment: Update your project schedule with the start/duration changes generated in








Activity Actual Cost Earned Value Percent Complete Planned Value planned Completion Budget WES Activity \fAssignment: Update your project schedule with the start/duration changes generated in Module 2 to recover from the storm. Complete the activity \"Pool-if ordered\" as WBS item 8.3. The pool costs $30,000 and takes 28 days to build. It must be completed in order to start landscaping. Include a screen shot of your revised schedule. Trim the excess and use an appropriate time scale to show the activity durations. Finally, you received the attached letter from Ralph Acme requesting an additional $350. What would you do to resolve this issue? ACME Heating and Air Conditioning 1201 Pearly Gate Road Heavenly, FL 30344 800-555-1212 Lic. No. HVAC 000001234 HappiHouses 1 HappiHouses Blvd. Grand, FL 30333 RE: A/C system for the San Leo, 7734 Mt. Olive Dr. Dear Sir/Madam, As you know, our quote for this house was $3,200. We completed the work on schedule and to specifications. Thank you for promptly paying our invoice. Last week, we had to make a repair to the duct work, because the electrician ran a piece of conduit through a duct, which we repaired yesterday by replacing 10 feet of duct. We sent a two-man crew, and the repair required two hours with one hour travel time. The materials were $5/foot for a total of $50. Qur two man crew has an hourly rate of $100.00 for a crew cost of %300 and a total cost of $350. In that this repair was no fault of ACME, we request an additional payment of $350. As you know, we rarely ask for additional payments, except when we feel that the additional cost is not caused by us. We enjoy working for HappiHouses and look forward to continuing our long and mutually beneficial relationship. Thanks in advance for your consideration of this request. Please call if you have any guestions. Sincerely, Ralph Acme Ralph Acme President Licensed HVAC Contractor No. HVAC 1234
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
