Question: Activity - Based Life - Cycle Costing Unit - based system: Variable conversion activity rate: $ 1 1 0 per direct labor hour Material usage
ActivityBased LifeCycle Costing
Unitbased system:
Variable conversion activity rate: $ per direct labor hour
Material usage rate: $ per part
ABC system:
Labor usage: $ per direct labor hour
Material usage direct materials: $ per part
Machining: $ per machine hour
Purchasing activity: $ per purchase order
Setup activity: $ per setup hour
Warranty activity: $ per returned unit usually requires extensive rework
Customer repair cost: $ per repair hour average
Activity and Resource Information annual estimates
Required:
Select the lowercost design using unitbased costing.
:
Are logistical and postpurchase activities considered in this analysis?
Select the lowercost design using ABC analysis.
What if the postpurchase cost was an environmental contaminant and amounted to $ per unit for Design A and per unit for Design B Compute the Postpurchase cost for each design.
PostPurchase Cost
Step by Step Solution
There are 3 Steps involved in it