Question: Activity : Deep Dynamic Compaction A construction site is a landfill area consists of thin top layer of fine grained soil underlain by a thick
Activity : Deep Dynamic Compaction
A construction site is a landfill area consists of thin top layer of fine grained soil underlain by a thick layer of clayey silt
with varying thickness between to m The total site area is about m by m The fill has a moderate to high
degree of saturation. The standard penetration tests were carried out prior to ground improvement work which
indicates the site ha SPT Nvalue at various chosen locations range between to with an average value of If
dynamic compaction is used as a ground improvement technique, provide a preliminary design. To minimize the
generation of excess pore water pressure multiple pass construction maybe used. Use a tamper weight of tons with
both tamper diameter and height as m Also check for suitability of the method based on the allowable vibration
PPV when one side of the site exists a residential area at a distance of m and other side a commercial area at a
distance of m
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock