Question: Activity duration is given below as (Pessimistic, Most Likely, Optimistic) for the three values in brackets. Activity Duration Expected Time Variance Standard Deviation A [8,5,2]
Activity duration is given below as (Pessimistic, Most Likely, Optimistic) for the three values in brackets.
| Activity | Duration | Expected Time | Variance | Standard Deviation |
| A | [8,5,2] |
|
|
|
| B | [4,3,2] |
|
|
|
| C | [15,10,5] |
|
|
|
| D | [9,8,1] |
|
|
|
| E | [15,10,5] |
|
|
|
| F | [8,5,2] |
|
|
|
| G | [11,10,3] |
|
|
|
| H | [10,6,2] |
|
|
|
| I | [3,2,1] |
|
|
|