Question: Activity Estimated Duration (days) 10 10 Specify overall system Specify module A Specify module B Specify module C Check specification Design module A Estimated Duration

Activity Estimated Duration (days) 10 10 Specify
Activity Estimated Duration (days) 10 10 Specify overall system Specify module A Specify module B Specify module C Check specification Design module A Estimated Duration Activity (days) 25 Design module B 20 Design module C 15 Code/test module A 15 Code/test module B 2 Code/test module C 5 System integration 25 20 15 5 Draw a PERT chart for the given scenario. Identify critical path. Use the correct notation, otherwise your answer will not be accepted