Question: Activity Optimistic Time ( a ) Most Likely Time ( m ) Pessimistic Time ( b ) Expected Duration A - Review Design 1 8

Activity
Optimistic Time (a)
Most Likely
Time (m)
Pessimistic
Time (b)
Expected Duration
A - Review Design
18
24
30
24
B - Assemble Item
14
21
28
21
C - Inspect Item
4
6
8
6
D - Package Item
5
10
12
?
Figure 7-5 Duration Estimates
Consider the activity duration estimates presented in Figure 7-5. Based on the information provided and adopting the PERT conventions to calculate expected activity durations, what is the expected duration of Activity D -Package Item?
a.9 days
b.9.5 days
c.12 days
d.10 days

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!