Question: Activity Pools Machining Setup Quality control Estimated Total Cost $ 639,600 Estimated Cost Driver 20,500 machine hours 101,625 157,700 500 batches 950 inspections Required:
Activity Pools Machining Setup Quality control Estimated Total Cost $ 639,600 Estimated Cost Driver 20,500 machine hours 101,625 157,700 500 batches 950 inspections Required: Suppose the Luxury boat requires 8,200 machine hours, 100 batches, and 247 inspections. Using activity proportions, determine the amount of overhead assigned to the Luxury product line. Note: Round your final answers to the nearest whole number. Cost Pool Allocated Overhead Machining Setup Quality Control Total Overhead