Question: Activity Predecessors Optimistic Time ( a ) Most likely Time ( m ) Pessimistic Time ( b ) A - - - - - -
Activity Predecessors
Optimistic
Time a Most likely
Time m Pessimistic
Time b
A
B A
C A
D B
E B
F C D E
G F
H F
I G H
NB: Time periods are in years
a Draw the activity network for this problem either AON or AOA
b Determine the expected time and variance for each activity.
c Show the activity schedule ES EF LS LF as well as the slack. You may work in the network or show the results in a table.
d Determine the state of the critical path for this project. This must be based on your work at C and not by inspection.
e What is the expected time, variance and standard deviation of the project?
f What is the probability that the project will be finished within day
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock