Question: Advanced Project B Activity B - 2 : Floor Plans, Elevations, and Sections 1 . What are the typical finish materials that are indicated on

Advanced Project B
Activity B-2: Floor Plans, Elevations, and Sections
1. What are the typical finish materials that are indicated on the elevations of the house?
Answer:
2. Refer to the front porch columns to answer the following questions.
A. How many columns are there?
Answer:
B. What note refers to the columns?
Answer:
C. What material is specified?
Answer:
3. What is the ceiling height at the covered front entry from the first floor level?
Answer:
4. On the rear elevation drawing, the windows located toward the center of the house are stepped down. What is inside the house to require this layout?
Answer:
5. What is the typical first floor window rough opening (R.O.) height?
Answer:
6. What type of flashing is specified where the roof intersects the facade of the house?
Answer:
7. What are the floor finishes in the following rooms?
A. Powder room #2
Answer:
B. Exercise room
Answer:
C. Kitchen
Answer:
D. Study
Answer:
8. What is above the toilet in Bathroom #2?
Answer:
9. Which note and which detail provide footing requirements for bearing stud walls?
Answer:
10. What note refers to the builders option projection screen and where is this item located?
Answer:
11. How many furnaces are there on the lower level?
Answer:
12. How is the singing platform constructed?
Answer:
13. What note refers to insulation on the foundation wall and what is specified?
Answer:
14. How high is the countertop in the bar area?
Answer:
15. What note refers to the limits of the ceramic tile in the bar area and how are the limits designated?
Answer:
16. What ceiling heights are specified in the following areas?
A. Storage/Mechanical #1
Answer:
B. Media area
Answer:
C. Linen closet
Answer:
D. Above singing platform
Answer:
E. Bulkheads in media area
Answer:
F. Garage
Answer:
G. Great room
Answer:
H. Foyer
Answer:
I. Study
Answer:
J. Bedroom #3
Answer:
K. Bulkheads and ceiling in great room
Answer:
17. What note refers to the dishwasher in the kitchen and where is this item located?
Answer:
18. What type of doors are specified for the following openings?
A. Florida room to eating area
Answer:
B. Front door
Answer:
C. Hallway to garage
Answer:
D. Garage car door
Answer:
19. Where are the attic access panels located?
Answer:
20. What is the minimum height of handrails and how is the height measurement taken?
Answer:
21. What manufacturer of windows is specified and what type of glass is required?
Answer:
22. What is the minimum percentage of aggregate glass area required for a habitable room?
Answer:
23. What note refers to the panel between the whirlpool tub and shower area and what is specified?
Answer:
24. Refer to the main stairs going up to answer the following.
A. How many risers are there?
Answer:
B. What is the riser height?
Answer:
C. What is the total rise?
Answer:
25. What is the overall size of Bathroom #3, including the shower area?
Answer:
26. What is different about the windows in Bedroom #2 and Bedroom #3 compared to the rest of the windows on the second floor?
Answer:
27. On the second floor plan, what does the circle symbol represent in the upper-left corner of the upper great room?
Answer:
28. How many lineal feet of clothes rod and shelf are required for Walk-in Closet #3? Give the answer to the nearest foot.
Answer:
29. What is the overall area of Bedroom #3, including the walk-in closet and bathroom?
Answer:
30. What is the typical roof overhang?
Answer:

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!