Question: Advanced Project C Activity C - 2 : Architectural Drawings 1 . What is the difference between the door to the vault on the first

Advanced Project C
Activity C-2: Architectural Drawings
1. What is the difference between the door to the vault on the first floor and the door to the vault on the mezzanine level?
Answer:
2. What color are the pipe rails around the loading dock areas painted?
Answer:
3. What type of lights are used in Room 200(large conference room)?
Answer:
4. What is the specification for the ceiling tile in the office?
Answer:
5. In the stair located behind the reception area, how many risers are needed?
Answer:
6. What is the narrowest space between racks in the warehouse?
Answer:
7. What two sizes of overhead doors are used in the loading dock areas?
Answer:
8. What is the elevation of the top of most of the precast wall panels?
Answer:
9. What size are the lockers in the womens restrooms?
Answer:
10. How thick are the restroom mirrors?
Answer:
11. In the stairs next to the elevator, what are the dimensions of the landing?
Answer:
12. How wide between masonry blocks is the opening for the elevator door?
Answer:
13. How far below the first floor is the top of the slab at the bottom of the elevator pit?
Answer:
14. What is the finish floor elevation in the warehouse?
Answer:
15. How many large (4\times 8) skylights are in the roof?
Answer:
16. What type of finish is used on the door to the VP Sales office?
Answer:
17. What is the maximum distance between handrail supports on the stairs?
Answer:
18. What color glass is used in the doors at the main (east) entrance to the office?
Answer:
19. The walls around the vault in the office are composed of three layers. What are these layers?
Answer:
20. In the copy area on the mezzanine level, how many wall-mounted cabinets are needed?
Answer:
21. What is the minimum allowable width and depth for the elevator car?
Answer:
22. What types of treads are used in the stairs?
Answer:
23. What is used for the interior finish of skylight shafts in the office?
Answer:
24. On the mezzanine level, what is the distance between the finished floor and the finished ceiling?
Answer:
25. What type of roofing system is used?
Answer:

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!