Question: AEC 2 7 0 Scraper Opera ons Scraper Produc on Calcula on Given a 6 3 1 K scraper fleet opera ng to move clay
AEC
Scraper Operaons
Scraper Producon Calculaon
Given a K scraper fleet operang to move clay soil. The Payload is lb when loaded. The haul
path is as shown. Assume minute hours. A scraper has a Ownership and Operaons cost of $ per
hour and a D has a cost of $ per hour, a D has a cost of $ per hour and a D is $ per hour.
All cost are exclusive of fuel. A turn takes minutes
Travelling Right to Le
Leg A feet TP in GR
Leg B feet TP in GR
Leg C feet TP inch GR
Leg D feet TP in GR
What Push Cat is recommended
What is the RR GR and TR for each leg in equivalent Grade In lbtgvw
What is the speed of the vehicle in each leg in and out?
Does the vehicle use the retarder at any me
What is the number of scrapers required? MAXMIN
What is the number of Cats Required? MAXMIN
What is the hourly producon in loose cubic yards?
A
B
C
D
use scrapper data
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock