Question: An 8-associate production crew is deployed on an assembly line as shown below. Assume all associates are equally experienced and skilled and that the line

An 8-associate production crew is deployed on an assembly line as shown below. Assume all associates are equally experienced and skilled and that the line flows continuously without stoppages: Section Associate Takt time (s) # of picks Responsibilities

Section Associate Takt time No of picks Responisbilities
1 A 6 0 Label and build box
B 4 2 Pick ice packs
C 7 6 Pick chilled ingredients
D 4 2 Pick chilled ingredients
Box travels on automated conveyor to new section of line
2 E 8 5 Pick non-chilled ingredients
F 5 3 Pick non-chilled ingredients
G 3 3 Pick recipe cards
H 2 0 Seal box

1. As deployed above, how many completed boxes can this crew assemble per hour? Which associate is currently the bottleneck? 2. Put yourself in the shoes of a Line Lead trying to maximize line speed. What changes would you consider to increase the hourly box throughout the line? What speed would these changes result in? 3. Now think of yourself as an Operational Excellence Analyst tasked with running this line as efficiently as possible. This line must assemble 3,800 boxes to ship out every 8 hours. Assuming each associate scheduled must work an 8 hour shift, how would you deploy an ideal crew? How many associates are required to hit the ship out time?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!