Question: An assembly line has been designed to make battery-powered beverage mixers. Task details are shown in the table below: Station Task Assigned Task Time (minutes)
An assembly line has been designed to make battery-powered beverage mixers. Task details are shown in the table below: Station Task Assigned Task Time (minutes) 1 1 3.0 2 3; 4 1.5; 2.0 3 2; 5; 6 1.5