Question: An assembly line operates for 8 hours per shift, 2 shifts per day, 6 days per week. The product that is assembled requires 1 6

An assembly line operates for 8 hours per shift, 2 shifts per day, 6 days per week. The product that is assembled requires 16 tasks to be completed. The longest task is takes 10 minutes, the shortest task takes 3 minutes, and the sum of the task times is 104 minutes.
What is the minimum possible cycle time for this line? The answer is a whole number.
What is the maximum possible cycle time for this line? The answer is a whole number.
What is the minimum possible weekly output for this line? Round to a whole number.
What is the maximum possible weekly output for this line?